Matanzas Creek Dam Rehabilitation

Project overview

The Sonoma County Water Agency (Sonoma Water), with the assistance of the United States Department of Agriculture Natural Resources Conservation Service (NRCS), is considering alterations to the Matanzas Creek Dam to bring the structure into compliance with current NRCS and Division of Safety of Dams (DSOD) design criteria. The proposed actions will improve dam safety and increase flood storage capacity for the City of Santa Rosa and surrounding communities. Matanzas Creek Dam was designed and constructed under the Central Sonoma Watershed Work Plan that was approved by Congress in 1958. Alterations funded by NRCS to bring the dam into compliance with current NRCS and DSOD criteria will require a supplement to the 1958 Plan. 

NRCS has prepared a supplemental watershed plan and environmental document (Plan-EA) to evaluate environmental impacts associated with rehabilitation of the Matanzas Creek Dam and comply with the National Environmental Policy Act (NEPA). Technical studies are complete, and the Plan-EA will be distributed for a 30-day comment period.

Project video

Project documents

The NRCS has completed this Draft Supplemental Plan-Environmental Assessment (EA) in accordance with the National Environmental Policy Act (NEPA) and NRCS guidelines and standards. Reviewers should provide their comments to NRCS during the allotted Draft Supplemental Plan-EA review period. Comments must be submitted by August 25, 2026, to become part of the Administrative Record.

The following documents open as PDFs and are available for public review. Physical copies of the Draft Plan-EA are available for review and inspection at Sonoma Water’s main office at 404 Aviation Blvd, Santa Rosa, CA 95403 and at the NRCS Petaluma Service Center at 5401 Old Redwood Highway North, Petaluma, CA 94954.

Appendices

Supporting Documents

Final-Plan Environmental Assessment (EA)

Draft-Plan Environmental Assessment (EA)

Public Meeting

View the presentation

In-person public meeting

Date: Tuesday, August 11, 2026

Comment Period Closed

Comments were accepted during the public meeting and by email or mail from July 26 through August 25, 2026.

Project schedule

Phase 6 of 6 Publish the final plan and environmental assessment

Scoping

Matanzas Creek Dam and surrounding project area
Matanzas Dam Auxiliary Spillway

Public scoping meeting

Date: Tuesday, April 13, 2021

Watch the recording of the public scoping meeting.

Scoping report

The Scoping Report summarizes outreach completed during the scoping process and provides the Natural Resources Conservation Service’s responses to comments received.

Scoping topics considered

From the Title 390 – National Watershed Program Manual, Part 501.24: 

Scoping must consider, but is not limited to, the following concerns: 

  1. National Economic Development principles and guidelines
  2. Air quality
  3. Coral reefs
  4. Cultural resources
  5. Ecologically critical areas
  6. Endangered and threatened species
  7. Environmental justice and civil rights
  8. Essential fish habitat
  9. Fish and wildlife, including coordination requirements
  10. Floodplain management
  11. Forest resources
  12. Invasive species
  13. Land use
  14. Migratory birds
  15. Natural areas
  16. Parklands
  17. Prime and unique farmland and farmland of statewide significance
  18. Public health and safety
  19. Regional water resource plans, including coastal-zone plans
  20. Riparian areas
  21. Scenic beauty
  22. Scientific resources
  23. Sole-source aquifers
  24. Social issues
  25. Soil resources
  26. Water quality
  27. Water resources
  28. Waters of the United States, including special aquatic sites
  29. Wetlands
  30. Wild and scenic rivers
  31. Other concerns identified by sponsoring local organizations, agencies and the public

Questions and project contact

Contact the project team with questions or comments.

Email: commentsCAwatersheds@usda.gov 
Phone: (530) 792-5510

Sonoma Water logo